Local Law 97 penalty estimate
388 Richmond Terrace: $21,863/year in fees starting in 2030
Loading map
Open Street View
Loading Street View
What would the estimated penalty be in 2030, assuming nothing changes?
$21,863/year
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 388 Richmond Terrace will be 82 tons over the cap.
- Penalty is $268/ton over the cap, $21,863 total
Cap: 356 tons
0438 tons emitted
What is the estimated penalty for 388 Richmond Terrace right now?
$0/year
- NYC caps a building's yearly greenhouse gas emissions.
- 388 Richmond Terrace is 88 tons under the emissions cap.
- So it owes no penalty.
Cap: 591 tons
0503 tons emitted
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 591 to 356 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 503 to 438 tons.
- Energy use is held the same.
- Tons over go from 0 to 82 tons.
How much would the building need to cut its emissions to avoid the penalty?
19% less emissions than today
- This building must emit 19% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is 388 Richmond Terrace?
47/100, grade D
- 388 Richmond Terrace scores 47 out of 100 for energy efficiency.
- That is grade D on the city's scale. 50 is typical for its type.
- It uses 98 kBtu per sq ft a year.
DCBA
470100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Staten Island
- 115 Stuyvesant Place$27,281 a year from 2030
- 36 Hamilton Ave$33,615 a year from 2030
- 36 Hamilton Avenue$33,615 a year from 2030
- 220 Osgood Avenu$23,996 a year from 2030
- 60 Hamilton Avenue$48,159 a year from 2030