Local Law 97 penalty estimate
1023 Broadway may pay $18,309/year in fees starting in 2030
Loading map
Loading Street View
Why is this property expected to pay a fee beginning in 2030?
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 1023 Broadway will be 68 tons over the cap.
- Penalty is $268/ton over the cap, $18,309 total
0Cap: 103 tons171 tons emitted
What is the estimated penalty for 1023 Broadway right now?
$10,963/year
- NYC caps a building's yearly greenhouse gas emissions.
- 1023 Broadway is 41 tons over the emissions cap.
- Penalty is $268/ton over the cap, $10,963 total
0Cap: 170 tons211 tons emitted
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 170 to 103 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 211 to 171 tons.
- Energy use is held the same.
- Tons over go from 41 to 68 tons.
How much would the building need to cut its emissions to avoid the penalty?
40% less emissions than today
- This building must emit 40% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is 1023 Broadway?
22/100, grade D
- 1023 Broadway scores 22 out of 100 for energy efficiency.
- That is grade D on the city's scale. 50 is typical for its type.
- It uses 135 kBtu per sq ft a year.
DCBA
220100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Brooklyn
- 3075 Brighton 14 St$18,772 a year from 2030
- 2015 East 7th Street$6,902 a year from 2030
- 885 East 38th Street$5,963 a year from 2030
- 1484 Sterling Place$69,944 a year from 2030
- 1617 President Street$9,173 a year from 2030